Drexel University – Race Street Hall

This 12-story, 130,000 SF student residence for Drexel University is home to 490 students in 130 two-bedroom suites. The contemporary building features common rooms and reading lounges on each living level, as well as centralized laundry and bike storage spaces on the first floor. The structure is steel frame with concrete plank decks, and the […]

Mann Center for the Performing Arts – Phase 1

INTECH renovated the grounds that house the existing Mann Center for the Performing Arts, the region’s only non-profit outdoor cultural arts center. The renovation, divided into two phases, included the addition of a new public Welcome Center and Entry Plaza, incorporating lighting and ornamental entry gates that lead guests onto the renovated Campus Green. The […]

Drexel University – Stiles Hall

The renovation of Stiles Alumni Hall, a 16-story residence for medical students at Drexel University’s Hahnemann Campus, included a complete interior demolition of the existing building down to the concrete structure. The interior of the building was demolished to the bare concrete, hazardous materials were removed, and 10 new apartments were ultimately created on each […]

Fiserv

INTECH completed the retrofit of five floors at Commerce Square, including a computer room renovation for Fiserv’s corporate office. INTECH also installed a new FM200 system as well as a new UPS system. The computer room was completed within the first month of construction, and had to be kept functional throughout the remaining phases of construction […]

Four Penn Center

This 20-story office building, originally constructed in 1964, required significant architectural renovations and engineering systems’ upgrades to re-market the property for modern office and institutional tenants. The project’s scope included complete demolition/abatement of the building’s existing systems, new entrances, window replacement, limestone spandrel cleaning/coating, main and upper lobby renovations, state-of-the-art mechanical/electrical systems, and elevator cab […]

3701 Market

This new Science and Technology Research Facility was created to enhance emerging research development and new technology business incubation. Modular research laboratories with flexible laboratory casework and state-of-the-art fume hoods enable adaptability at wet labs and prep areas. Shafts were sized to allow future expansion of wet labs for ventilation systems without disruption. A backbone […]

Westbrook Corporate Center

Westbrook’s 20-acre site was completed within four months from the start of construction, allowing the stabilization of finished surfaces to be completed six months ahead of schedule. The buildings were constructed of all pre-cast exteriors, marble flooring and atria walls. This project required installation of underground recharge beds, designed to be environmentally correct. With INTECH’s input, […]