INTECH has built two stores for Target, and while the results appear similar to the consumer, the challenges faced in construction differ among locations. In large-scale construction of this type, INTECH performs deep assessment of site conditions, environmental impact, infrastructure (existing and future), and utilities. INTECH also looks to find ways to perform tasks that […]
Renovation construction was performed in the basement and at the street level of the historic National City Bank Building. Project features also include a rich walnut floor, painted wood millwork, display vitrines to divide the store into merchandising zones, composite panels with metal fittings, and continuous, indirect recessed lighting. This 5,400 square foot concept store […]
INTECH worked closely with the Owner, the base building architect, Ennead Architects, and the retail space architect Lalire March Architects to construct a new retail store and cafe space within the National Museum of American Jewish History. The store was constructed with built in wood and custom glass millwork cases. One of the main features […]
Ground was broken in early 2007 for the ParkWest Town Center at 52nd and Jefferson Streets, the largest retail development in West Philadelphia, as well as the largest revitalization development in any Federal Emplowerment Zone in Pennsylvania. INTECH constructed the 65,300 SF ShopRite supermarket (the largest ShopRite in Philadelphia) as well as 11 core and […]
The nature of the location, coupled with the requirements set forth by the Division of Aviation and the City of Philadelphia, mandated that the INTECH/McCrae joint venture maintain the utmost in safety in this very public area. Despite the challenge, the project was delivered on time within a compressed timeframe.
INTECH has constructed three Fresh Fields stores in the last 10 years for this urban grocer, two in Philadelphia and one in New Jersey. These stores introduced the concept of a whole food marketing for the growing inner city as well as the ever-growing Marlton area. From complex structural challenges to carefully working with existing […]
The Plymouth Meeting Best Buy store required complete construction, from footings through retail store fit-out, including coordination with utilities, state, and local agencies. Special issues included partial building construction due to a utility/road conflict at rear footing line, sinkhole remediation at main entrance, and extensive changes from tenant prototype mid-way through construction. At the Springfield […]
Tenants at “The Court,” a large retail power center, included Bryn Mawr Stereo, Barnes & Noble, Bed Bath & Beyond, Old Navy, and Men’s Warehouse. INTECH and Deptford Township officials worked closely to allow for a smooth temporary certification of varied tenant occupancies.
Construction of a major retail complex featuring 18 major stores on 73 acres posed many challenges, including rerouting a stream, widening a major road, constructing five intersections with traffic signals, and coordinating with all local utilities. The existing soil conditions on this 73-acre site required substantial undercuts and significant grading, including bulk excavation, earthwork and […]
INTECH renovated an electronics store located in the B/C Connector at the Philadelphia International Airport for InMotion. The project took place in an active airport terminal within the security perimeter.The entire space was demolished and then renovated with all new flooring, ceiling, lighting and casework. INTECH’s ability to self-perform significant portions of the work including […]