This occupied lobby renovation was within Parkway’s corporate office and was required to stay operational throughout construction. This construction needed to be phased with temporary barricades isolating the project from the operating facility. Certain aspects of the job were performed at night or during the weekends, due to the amount of disruption it would cause […]
INTECH renovated Beneficial’s popular branch on Route 73, while it stayed in operation. A detailed schedule coordinated with the branch managers was developed prior to any work beginning to limit the amount of disruption that would occur during the renovation. Temporary barricades and phasing were required along with all the work being performed off-hours. INTECH […]
INTECH provided Pre-Construction Services for the Wissahickon Charter School project, which is a new 2-story education building on a 3.72-acre site. The building and site feature elements that highlight the school’s mission of learning with an environmental focus. The new building contains approximately 20 classrooms, a media lab, common spaces, gymnasium, and a cafeteria. The […]
The renovation for the Pond Lehocky Stern Giordano space presented a challenging schedule with many long lead time issues to overcome. The project was spread out over three floors, with two of the upper floors dedicated to the company partners and a lower floor of One Commerce Square for support staff and back-of-office functions. The […]
INTECH completed the renovation of the office space within the occupied workplace of Morgan Lewis in Center City Philadelphia. Part of the work included the selective demolition of finishes and the installation of new Italian marble stone floors throughout the lobby areas and on the countertops of the reception desks. Wallcoverings, new cabinetry, and woodwork […]
Brandywine’s office relocation needed to be performed within less than three months and required demolition of an existing mezzanine area within the occupied building. Other work included marble, millwork, glass partitions, exterior window modifications, wallcoverings/fabric wrapped panels, and open ceilings with MEP modifications. Although the permitting process delayed the project start and there were several […]
The National Liberty Museum is located at 321 Chestnut Street. It was founded in 1995 by Irvin J. Borowsky out of a desire to make the world a better place. Located in the heart of historic Philadelphia, adjacent to Independence National Historical Park, the museum is dedicated to preserving America’s heritage of freedom. The museum […]
INTECH competitively budgeted an 8,500 SF space at Two Commerce Square for a law firm that was relocating from Two Liberty Place. Once awarded, INTECH worked closely with Gensler (architect) and the Owner’s Representative out of Kansas City, MO to develop a GMP and maintain it throughout construction, while maintaining the schedule.
The project included laboratory and office fit-out with heavy concentration of owner supplied laboratory equipment and fixtures. The existing space was raw space that required completely new mechanical equipment and ductwork, and electrical systems. Heavy coordination of work with the occupied floor below involving floor coring and plumbing work. As part of the project, INTECH […]
The Russell Byers Charter School planned renovations and construction of a new addition to their current facility at 1911 Arch Street. Through the addition of student classrooms, cultural arts rooms, a gymnasium/ assembly space, and a rooftop play area, the School hopes to expand its current K – 6th grade curriculum to include 7th and […]