The 8th floor fit-out includes lab workspaces, office spaces, and community areas. The project features entirely new MEP systems installed throughout the space to support modern infrastructure needs. In the office area, new demountable glass fronts were added to create an open and collaborative environment. High finished ceiling decks contribute to a clean, contemporary look, […]
The renovation of the third floor at 3737 Market Street creates new therapy spaces, including exam rooms and a hand therapy room. The phased fit-out includes demolition of an existing therapy pool and structural reinforcement to accommodate the new spaces. The project adds new administrative offices, a waiting area, and five exam rooms, creating a […]
INTECH partnered with Trinity Health to expand the St. Mary’s Medical Center Ambulatory. St. Mary’s Medical Center has been serving its community in Langhorne, Pennsylvania for over 150 years. This project involves the renovation of an existing Rite Aid space into a modern Ambulatory Outpatient Exam Suite. The new layout will feature 16 exam rooms, […]
After construction of the 3151 Market core and shell building, INTECH’s 7,000-square-foot design-build fit-out for the Pennsylvania Liquor Control Board (PLCB) will activate the ground floor space of the new building. The work involves creating a retail environment with custom MEP and architectural systems tailored to the needs of the store. The renovation will ensure […]
This 12,000 SF corporate office fit-out was completed on an accelerated 12-week schedule, beginning in November and running through the holiday season. The scope included the demolition of the central stairwell and construction of two new staircases designed to improve the tenant’s circulation and spatial flow. These new stairs connect the upper and lower levels […]
The Sacred Heart Recovery Residence opened with 14 respite beds and 48 entry-level long-term beds, serving people who have experienced homelessness and are committed to recovery. The scope of the project includes demolition, renovation of the basement level to create sleeping areas, restrooms and a new laundry area. Incoming electrical service for the basement level.
The University of Pennsylvania’s Fisher Fine Arts Library is a historic landmark that serves as the home to five educational hubs within the university. Completed in 1891, the building’s rich history is carefully preserved through thoughtful, minimal modifications aimed at enhancing its functionality while maintaining its architectural integrity. The scope of the project includes masonry […]
The Cooper Street Gateway project will revitalize 14 vacant historic properties and several vacant lots along the 400 block of Cooper and Lawrence Streets, transforming them into a vibrant new facility. While the university is eager to begin construction, ensuring the preservation of the historic buildings and any potential artifacts uncovered during the process remains […]
The Foundation Academy Collegiate project was a complete renovation of a historic Doll Factory. Foundation Academy Collegiate serves high school scholars of the Trenton area and is renovating this historic building to accommodate for its growing student body. The 91,600 SF project maintained the historic structure of the building while also providing new accommodations for […]
Myers Hall was a three-story residence hall built in 1977. The slab-on-grade structure used block and plank construction and wood roof trusses and was removed via a two-phase demolition process. The demolition made way for a multi-use greenspace and a new switchgear building that services neighboring buildings on Drexel University’s campus. The INTECH–WEBCO joint venture […]