The new Hotel West + Main – a Tapestry Collection by Hilton hotel – is the final phase of the SORA West development project. The six-story hotel has 127 hotel rooms and will connect to an adjacent 146-year-old historic firehouse. With a generous hotel lobby, dining areas, meeting rooms, and indoor and outdoor lounges, the new hotel managed by Concord Hospitality will complete the current SORA West development. A rooftop bar and lounge will overlook the amphitheater and plaza while retail shops on the ground floor will connect to the public space, which will feature events and live music. The new structure is wood framing over a steel podium, and the façade consists of brick, exterior insulation finishing system (EIFS), and metal wall panels.
Size: | 94,000 SF |
---|---|
Client: | Concord Hospitality Enterprises / Keystone Property Group |
Architect: | DLR Group |
Completion: | May 2022 |