Wexford Science Center – Office Fit-out

To accommodate growth, the Science Center relocated their offices from 3701 Market Street to the Wexford Science Center building at 3711 Market Street. INTECH completed a fit-out of office space and conference rooms on the eighth floor that features conference rooms, a cyber café, and open reception area. Due to schedule requirements, great care was […]

3711 Market

3711 Market is a new, 186,000 SF, 10-story building located on the Science Center campus on Market Street adjoining Drexel’s and Penn’s campuses in West Philadelphia. The building, comprised of a steel frame with composite deck and a combination of curtainwall, glass, and masonry on precast panels, contains state-of-the-art, laboratory-ready facilities, office space, and retail. […]

Lubert-Adler

Lubert-Adler is a real estate private equity firm based in Philadelphia, specializing in redevelopments through joint ventures with local operating partners. When the Cira Centre was completed in 2005, Lubert-Adler leased the top two floors, capturing the most prized 360-degree views of the city. The space, originally intended for a restaurant, features a private elevator, […]

Brandywine Global Investment Management

Brandywine Global Investment Management offices on two floors of the Cira Centre required a high-end tenant fit-out, including a 750 SF server room for state-of-the-art networking needs. The finishes included exquisite wood flooring and frameless glass partitions to enclose offices, meeting rooms, and conference areas. The 50,000 SF space was on a fast-track schedule, completed […]

Fiserv

INTECH completed the retrofit of five floors at Commerce Square, including a computer room renovation for Fiserv’s corporate office. INTECH also installed a new FM200 system as well as a new UPS system. The computer room was completed within the first month of construction, and had to be kept functional throughout the remaining phases of construction […]

Four Penn Center

This 20-story office building, originally constructed in 1964, required significant architectural renovations and engineering systems’ upgrades to re-market the property for modern office and institutional tenants. The project’s scope included complete demolition/abatement of the building’s existing systems, new entrances, window replacement, limestone spandrel cleaning/coating, main and upper lobby renovations, state-of-the-art mechanical/electrical systems, and elevator cab […]

250 Century Park

This four-story speculative office building was completed within a 12-month construction period. The exterior features a brick facade with blue tinted glass strip windows accented by limestone sills. The curved facade, featuring aluminum wall panels, aluminum soffit panels, and strip windows, required intensive coordination. Due to schedule constraints, the aluminum wall panels were fabricated in […]

3701 Market

This new Science and Technology Research Facility was created to enhance emerging research development and new technology business incubation. Modular research laboratories with flexible laboratory casework and state-of-the-art fume hoods enable adaptability at wet labs and prep areas. Shafts were sized to allow future expansion of wet labs for ventilation systems without disruption. A backbone […]

Westbrook Corporate Center

Westbrook’s 20-acre site was completed within four months from the start of construction, allowing the stabilization of finished surfaces to be completed six months ahead of schedule. The buildings were constructed of all pre-cast exteriors, marble flooring and atria walls. This project required installation of underground recharge beds, designed to be environmentally correct. With INTECH’s input, […]

American Heritage Federal Credit Union – Corporate Headquarters

American Heritage Federal Credit Union required extensive Pre-Construction budgeting to ensure economical means and methods; constructable details and accommodation of the desired final aesthetic content and quality. After this extensive and successful Pre-Construction exercise, INTECH Construction was required to construct this challenging and intricately detailed project while maintaining and preserving the original budget, schedule, and most […]