This renovation for Drexel University included demolition within an occupied building, requiring tight control over noise, dust, and temporary utility disruptions. An open ceiling plan was designed to show exposed utilities, and glass partitions and doors allow views into the various spaces. The project also included adding windows to the front façade of the building […]
The reconstruction and renovation of the Headhouse has become the foundation for future economic development in this important transportation and retail location. It is also the historic anchor for the eastern section of Market Street.
With vehicles in operation every day except Sunday, the USPS has voluminous maintenance needs. INTECH managed the construction of this 60,000 SF new maintenance facility comprised of eight service bays, lifts, lubrication equipment, and complete tool setup.
Project HOME constructed a new wellness center at 22nd Street and Cecil B. Moore Avenue, to relocate its current clinic that was operating in the St. Elizabeth Community Center for the past 18 years. The new center expands its primary care, behavioral health and health education services to increase its reach in the community, and […]
INTECH renovated the second floor of 3020 Market Street and constructed a new Histology and Cytology Processing Center for the University of Pennsylvania Health System. This laboratory fit-out included installations of extensive laboratory casework, fume hoods, and all related mechanical systems, as well as major rooftop chillers, an emergency generator, and chemical storage in the […]
Renovation of the Main Lobby at Chestnut Hill Hospital upgraded the center of the hospital, connecting a newly constructed hospital wing with the original main hospital building. Because the main lobby links the two main buildings at the hospital, the project required three phases in order to maintain operations and pedestrian flow at the entrance. […]
This Pediatric Care Center offers the highest level of services to the children of West Philadelphia. The facility is able to handle more than 45,000 patient visits per year. It is a core location for CHOP’s medical education programs and community activities. The project included a two-story steel and concrete structure with a masonry, stone, […]
This two-phased renovation project included construction of both patient exam rooms and physician offices. The work area was located directly below the Post-Partum Unit and above the Radiology Department, making dust and noise pollution control primary considerations during all phases of construction.
For this project, two Diagnostic Imaging (DI) and control rooms were added adjacent to an existing DI. The imaging rooms were located on the first floor, below ground, and are equipped with state-of-the-art technologies. Challenges included Level Four ICRA requirements and a fast-track, inflexible schedule during this four-phased project in an occupied facility.
INTECH has completed four phases of work in a 13-month, multi-phase engagement to the Operating Rooms at Fox Chase: Phase I: Two New Operating Rooms Phase II: Renovation to Waiting Rooms, Anesthesia Rooms and Offices Phase III: Thirteen Pre-op Patient Rooms Phase IV: Seven Post-op Patient rooms The chief challenge of this project was working […]